| Month |
Date
|
Hours
|
Doing
|
| Earlier |
|
|
I have been reading all things Dax for nearly a year and
placed my order back in April. However, this log is only for
"hands on" time, not research. These |
|
August
2002
|
24 |
1 |
 |
Dis-assembled steering column, wheel,
cowl and switches ready to send to Dax. |
 |
Removed calipers and discs from knuckles
and lower balljoint nuts. |
|
| |
|
|
|
| September 2002 |
|
|
|
14 |
12 |
 |
Collecting the chassis |
 |
Checking off inventory and squirreling
bits away. |
|
| |
15 |
1 ½ |
Finished making the trestles, turned chassis upside down,
rubbed down few rough patches of powder coat |
| |
16 |
½ |
Cleaned rough edges off SVA bars ready for chroming. |
| |
18 |
2 |
Trimmed the 2 large floor panels to fit. |
| |
20 |
2 |
Trimmed first inner side panel and drilled its lower holes. |
| |
21 |
3 |
Second inner side panel and drilled main floor panels |
| |
22 |
5 |
Drilled chassis, fitted both floor panels and both front
infill panels. |
| |
25 |
½ |
Two diff bushes and ball joint. |
| |
27 |
1 |
Remaining diff bushes and A-frame |
| |
28 |
¼ |
Trailing arm bushes |
| |
29 |
3 |
Trimming and drilling foot well panels and interior ali side
panels. |
| TOTAL |
|
30 ¾ |
for September |
| |
|
|
|
|
October 2002 |
|
|
|
2 |
1 |
Painting and preparing interior ali panels |
| |
3 |
1¼ |
Unpacked diff and ali panels again. |
| |
4 |
4½ |
Fitted diff - yes it really did take four hours (and that's
two of us) |
| |
5 |
1½ |
Cleaning donor parts, taking first drive shaft apart. |
| |
6 |
5 |
Strip rear sub frame initial clean. Install dedion
tube. |
| |
7 |
1 |
Fill diff with oil, cleaning donor bearing carriers |
| |
9 |
½ |
More cleaning of donor stuff |
| |
10 |
1 |
First of the wheel bearing removed. |
| |
11 |
½ |
Fitted springs to shocks and put new seats in place for no
real reason. |
| |
12 |
5½ |
Fitted rear springs and shocks. Second wheel bearing
removed. Cleaning donor components. |
| |
13 |
4½ |
Cleaning Components. Painting some of the bits.
Tried fitting of nearside transmission tunnel panel. |
| |
15 |
1 |
Fitted passenger footwell end panel. |
| |
16 |
1 |
Trial fitted passenger transmission panel, and started on
nearside ears. |
| |
19 |
5 |
Painted Bearing Carriers, fitted nearside cockpit ali side
panel. |
| |
20 |
4 |
Drivers transmission tunnel panel, trial fitted and general
tidy up. |
| |
24 |
¾ |
Fitted bearing carriers, stub axles and wheel flanges. |
| |
25 |
½ |
Cleaning CV joints. |
| |
26 |
5 |
Re-assembled and fitted driveshafts and started rear brake
pipes. |
| |
27 |
1¾ |
More brake pipe and offside cockpit ali side panel. |
| TOTAL |
|
45 ¼ |
for October |
| |
|
77 |
for Build |
| |
|
|
|
|
November
2002 |
|
| |
2 |
2½ |
Prepared the 'Rear Bulkhead Side Panels' (aka ears). |
| |
3 |
1½ |
Fitted the "ears" prepared yesterday. |
| |
9 |
4 |
Preparing rear bulkhead panel and improving fit of
transmission tunnel. |
| |
10 |
4½ |
Bracket for fuel pump and more work on rear bulkhead panel. |
| |
12 |
¾ |
Wurthed Wing Piping round top curve of rear bulkhead panel
and fuel pump bracket. |
| |
16 |
3¼ |
Fitted rear bulkhead panel, fuel pump and tank. |
| |
24 |
2 |
Started stripping / cleaning rear brake callipers. |
| TOTAL |
|
18½ |
for November |
| |
|
95½ |
for Build |
| |
|
|
|
| December 2002 |
|
| |
15 |
5 |
Stripped, cleaned and painted rear callipers |
| |
21 |
2½ |
re-assembled first calliper |
| |
22 |
4 |
Finished rear callipers, assembled steering column and
offered up, cut ali' sheet. |
| |
26 |
4½ |
Working out / starting, fixings for high back seats. |
| |
27 |
4 |
More work on seat fixings and extra floor rivets. |
| |
28 |
5 |
Finished seat brackets and painted them, cut some outer ali
side panels and devised alternative handbrake arrangement. |
| |
29 |
5½ |
Cleaning front hubs and callipers. |
| |
30 |
2 |
More cleaning of hubs. |
| |
31 |
3 |
Painting front hubs, and cleaning callipers |
| TOTAL |
|
35½ |
for December |
| |
|
131 |
for Build |
| |
|
|
|
| January 2003 |
|
| |
1 |
3 |
Preparing callipers including filing space for banjo
connection. |
| |
18 |
2 |
Final clean of callipers and painted both them and the
quick-rack. |
| |
25 |
4 |
Fitted steering rack, and worked on filling out front
calliper carriers. |
| |
26 |
3½ |
Finished carriers, cleaned and painted them. |
| TOTAL |
|
12½ |
for January |
| |
|
143½ |
for Build |
| |
|
|
|
| February 2003 |
|
| |
1 |
4 |
Upgrade of diff output flanges, fitted pre-pump filter,
extra side panels. |
| |
2 |
4 |
Finished fitting the additional ali side panels. |
| |
22 |
4½ |
Slimmed steering column (I have late model Dax recommend
early). Finally worked out how I am going to do the transmission
tunnel. |
| |
23 |
2 |
Finished new tunnel bracket and waterproofing infill,
fitted as well. |
| TOTAL |
|
14½ |
for February |
| |
|
158 |
for Build |
| |
|
|
|
| March 2003 |
|
| |
2 |
3 |
Tunnel fixings. |
| |
11 |
1 |
Tunnel again. |
| |
16 |
3 |
Tunnel - at last I think I have made it watertight. |
| |
17 |
1½ |
Spreader plates, and handbrake contemplations. |
| |
19 |
½ |
Handbrake cables. |
| |
21 |
½ |
New wheel studs, |
| |
22 |
3½ |
Masking and painting rear brake discs. |
| |
23 |
2 |
Curing paint and masking up front discs. |
| |
25 |
1½ |
Fitted nearside rear brakes for final time? And
pre-pump fuel pipes. |
| |
26 |
1 |
Fitted offside rear brakes and rear handbrake cables. |
| |
29 |
5 |
Painted front discs, handbrake mountings. Fitted
speedo reed switch and fuel tank sender. Tunnel services plate. |
| |
30 |
5 |
Determined scuttle position and fixed. |
| TOTAL |
|
27½ |
for March |
| |
|
185½ |
for Build |
| |
|
|
|
| April 2003 |
|
| |
9 |
1½ |
Started work on front brake pipes and component positions. |
| |
10 |
1 |
More front brake pipe. |
| |
12 |
4½ |
Vent escutcheons and wiper spindle holes |
| |
13 |
2 |
Other vent |
| |
14 |
2 |
Working out demister duct and wiper parts positions. |
| |
15 |
½ |
General pottering and thinking time. |
| |
16 |
1 |
Started fitting 12v heaters and wiper boxes. |
| |
22 |
1¼ |
Cleaning Engine Mounts |
| |
26 |
5 |
Demister ducting, 12v heaters, brake master cylinders,
painting engine mounts and footwell end panel. |
| |
27 |
5 |
Wiper motor mounting plate, battery shelf trimming, pedal
box cover |
| |
28 |
1½ |
Fitted wiper motor, bracket for fuel pump and positioning
of scuttle cut out. |
| |
29 |
1½ |
Scuttle cut out and wurthing in recessed dish. |
| |
30 |
½ |
Working out next cuts. |
| TOTAL |
|
27 |
for April |
| |
|
212½ |
for Build |
| |
|
|
|
| May 2003 |
|
| |
6 |
1 |
Cut round pedal box rails, loosely fitted scuttle. |
| |
7 |
2 |
Engine arrives, unpacking and fixing gearbox to engine and
engine mounts loosely into car. |
| |
8 |
3½ |
Lowering onto axle stands and first attempt and trial
fitting engine/gearbox. |
| |
9 |
1 |
Oil filter and gearbox lugs removed. |
| |
10 |
3 |
Gelcoat, painting and general tidy up |
| |
11 |
3½ |
More fibre glassing, ENGINE IN. |
| |
12 |
2¼ |
Pedal box positioning etc. |
| |
13 |
1½ |
Steering column positioning started and front plumbing
routes. |
| |
14 |
2 |
ditto. |
| |
24 |
5 |
Half moon plate, clutch slave cylinder, radiator and oil
cooler brackets. |
| |
25 |
6½ |
Oil Cooler, Radiator. EWP Bracket. Various
thoughts. |
| |
26 |
6½ |
EWP, Oil Filter Bracket, Gearbox mount, Pipe routes?,
Tunnel modifications |
| |
27 |
1½ |
Battery Shelf Layout |
| |
28 |
1 |
Coolant pipework order. |
| |
29 |
½ |
Positioning and bolt/rivet holes. |
| |
30 |
1 |
Unpacking parcels and working out throttle cable. |
| |
31 |
6½ |
Throttle, final positioning decisions, then engine out. |
| TOTAL |
|
48¼ |
for May |
| |
|
260¾ |
for Build |
| |
|
|
|
| June 2003 |
|
| |
1 |
4 |
Lots of holes, then drivers footwell end panel, gearbox
plug. |
| |
2 |
1½ |
Triangular transmission tunnel panels fitted |
| |
3 |
2 |
Steering column. |
| |
4 |
1¾ |
Battery shelf and pedal box cover fitted. |
| |
5 |
2 |
Pedals and fuel regulator. |
| |
6 |
1½ |
Brake pipes. |
| |
7 |
5 |
Brakes, fuel lines, battery tray, misc' fittings. |
| |
8 |
7 |
Engine in, starter motor, fuel, propshaft. |
| |
13 |
2 |
Cutting another hole in the tunnel. |
| |
14 |
6 |
Fibre glassing of tunnel, steering column align and final
fit, fit EWP, start making rear wiring harness. |
| |
15 |
7 |
Earth points, brake pipe flared, fitted tunnel, connect
handbrake, trial light pod. |
| |
19 |
¾ |
Getting rear tub out of storage and initial trimming
thoughts. |
| |
21 |
3½ |
Rear wiring. |
| |
24 |
1 |
More positioning and fettling on the rear tub. |
| |
25 |
1½ |
More positioning and fettling on the rear tub. |
| |
26 |
1¾ |
More positioning and fettling on the rear tub. |
| TOTAL |
|
48¼ |
for June |
| |
|
309 |
for Build |
| |
|
|
|
| July 2003 |
|
| |
12 |
3 |
Steering correction, and wiring. |
| |
13 |
4 |
Wiring and bracket for special lower coolant pipe. |
| |
17 |
¾ |
Oil pipework |
| |
19 |
4 |
Re-make brackets, fit first water pipes, fit alternator. |
| |
20 |
7 |
Fit EWP and some water pipes. Fit oil cooler, remote
filter, radiator and fan. Rear tub and some work on making front
wiring loom. |
| |
22 |
1½ |
Fan controller and wiring. |
| |
23 |
1½ |
Wiring and alternator adjustor bracket. |
| |
28 |
1¼ |
Remaining oil pipes, blanking plug and turning engine over. |
| TOTAL |
|
23 |
for July |
| |
|
332 |
for Build |
| |
|
|
|
| August 2003 |
|
| |
22 |
1½ |
Wiring and Air Horns |
| |
23 |
2½ |
Wiring |
| |
24 |
5 |
Wiring, transmission tunnel and choke cable bracket |
| |
25 |
6½ |
Side panels |
| |
26 |
2½ |
Choke cable and side panels. |
| |
27 |
1¾ |
Bonnet positioning. |
| TOTAL |
|
19¾ |
for August |
| |
|
351¾ |
for Build |
| |
|
|
|
| September 2003 |
|
| |
1 |
¾ |
Dash Layout. |
| |
16 |
7 |
Expansion tank, side panels, port exhaust. |
| |
18 |
7½ |
Fuel pipe, side panels, carpets. |
| |
20 |
6 |
Nearside exhaust, fuel filler cap. |
| |
21 |
4 |
High level brake light, number plate light, number plate
surround and screen wash bottle. |
| |
27 |
2½ |
Scuttle |
| |
28 |
7 |
Side panel, trial fit exhaust, level engine, holes into
side panel. |
| TOTAL |
|
34¾ |
for September |
| |
|
386½ |
for Build |
| |
|
|
|
| October 2003 |
|
| |
1 |
6½ |
Side panel, exhaust, wiring and front flexi brake pipes. |
| |
2 |
6½ |
Expansion tank, top coolant hose, some adjustments and
scuttle wiring. |
| |
4 |
3 |
Wiring |
| |
5 |
5½ |
Wiring and coolant system. |
| |
6 to 10 |
2 |
Wiring and fuel leak. |
| |
14 |
1 |
Lead organisers on rocker covers. |
| |
15 |
½ |
Air Filter, Connecting dash and fuel leaks. |
| |
17 |
1 |
Run on timer, fuel sender wiring, battery on charge. |
| |
18 |
5 |
Engine start and oil pressure problems. |
| |
19 |
2½ |
Remove leaky fuel tank, carpets and wiring. |
| |
20 |
¼ |
Gluing wing piping onto the leading edge of bonnet. |
| |
21 |
1¼ |
Fit replacement fuel tank. |
| |
25 |
3 |
Bonnet, screen wash nozzle and headlights. |
| |
26 |
2 |
Wiring. |
| |
28 |
1½ |
Wiring, refitting oil gauge and sender. |
|
29 |
1 |
Started and checked for oil leaks and pressure
readings when warm |
| TOTAL |
|
42½ |
for October |
|
|
429 |
for Build |
|
|
|
|
| November 2003 |
|
|
1 |
2 |
Wiring, remedial work on headlamp shells,
thoughts on column shroud. |
|
2 |
2 |
Wiring and approx hole in bonnet for air
filter. |
|
15 & 16 |
3 |
Carpet, screen wash and wiring. |
|
17 |
3 |
Alternator, Carpet and Seat Mountings |
|
18 |
1½ |
Carpet |
|
22 |
2½ |
Wiring |
|
23 |
4 |
More Wiring |
|
24 |
½ |
More Wiring - headlights now work correctly. |
|
25 |
½ |
Nose cone trial. |
|
29 |
3 |
Nose cone pivot and carpeting. |
| TOTAL |
|
22 |
for November |
|
|
451 |
for Build |
|
|
|
|
| December 2003 |
|
|
8 |
1½ |
Nose cone pivot mounting. |
| |
9 |
2½ |
Nose cone rear brackets. |
|
13 |
1½ |
Wiring |
|
14 |
2 |
Wiring and bonnet. |
|
16 |
1 |
Bonnet |
|
17 |
¼ |
Wing Piping onto front of bonnet. |
|
21 |
3 |
Wiper Gear, Scuttle & Carpet |
|
22 |
¼ |
Finisher ring and gear lever gaiter. |
|
25 |
1 |
Front wishbone bushes. |
|
26 |
4 |
Carpets & Nearside front suspension. |
|
27 |
4 |
Gear lever gaiter, Nearside front suspension
& Brakes. |
|
28 |
3 |
Offside front suspension, Brakes & Wheels. |
|
29 |
2 |
Bonnet |
|
31 |
4½ |
Headlights & Radiator grill |
| TOTAL |
|
30½ |
for December |
| |
|
481½ |
for Build |
| |
|
|
|
| January 2004 |
|
|
1 |
1½ |
Radiator grill |
|
2 |
3½ |
Cowl & Windscreen supports. |
|
3 |
5 |
Windscreen and carpets. |
|
4 |
2½ |
Cowl |
|
7 |
1 |
Swap front callipers over, nearside/offside. |
|
11 |
5 |
Suspension, steering rack extensions & ball
joints, carpets. |
|
12 |
¼ |
Carpet and floor foam. |
|
14 |
1 |
Carpet and seats. |
|
16 |
1 |
Carpet. |
|
17 |
3 |
Little jobs and thinking. |
|
18 |
5 |
Pedal stop, carpet, dashboard and kick strips. |
|
19 |
1 |
Breather, tight wheel and kick strip. |
|
24 |
4 |
Kick strips and nearside front cycle wing. |
|
25 |
5 |
Steering column cowl and stalks. |
|
30 |
2 |
Offside front wing. |
|
31 |
6 |
Indicator stalks, alarm and wing piping on
nearside front. |
| TOTAL |
|
46¾ |
for January |
|
|
528¼ |
for Build |
|
|
|
|
| February 2004 |
|
|
1 |
4½ |
Scuttle fitted, hydraulics fitted. |
|
2 |
1½ |
Bleeding, testing clutch etc, front wings. |
|
3 |
1 |
Bonnet latches and SVA application form. |
|
4 |
¼ |
Marking for bonnet catch positions. |
|
5 |
1¼ |
Fitting lower halves of bonnet catches. |
|
6 |
1 |
Bonnet catches, upper sections. |
|
7 |
6 |
LIFT DOWN, garage spring clean and dashboard
edging. |
|
8 |
4 |
Stalks and dashboard. |
|
9 |
½ |
Dashboard |
|
10 |
1 |
Dashboard |
|
13 |
1 |
Miscellaneous |
|
14 |
6 |
Nearside rear wing and dashboard. |
|
15 |
6 |
Offside rear wing, rear lights and dashboard. |
|
16 |
1½ |
Rear lights. |
|
17 |
1½ |
Covered dashboard in vinyl. |
|
18 |
3 |
Instruments fitted to dashboard. |
|
20 |
2½ |
Dashboard fitted into car. |
|
21 |
5 |
Rear lights fitted, front suspension tightened
and initial set-up. |
|
22 |
6 |
Front suspension set-up, Isoflex underside of
wings, fitted fog light, wired rear lights. |
|
24 |
1 |
Pond liner. |
|
26 |
½ |
Wing mirrors. |
|
27 |
1½ |
Pond liner and covering dash lower edge trim. |
|
28 |
6½ |
Booked MOT, pond liner, made first of infill
panels for under dashboard, fitted the first section of dash lower edge
trim, stiffened headlamp shells and covered main section of dash trim. |
|
29 |
4 |
Pond liner finished, harness's fitted and
started exhaust wrap. |
| TOTAL |
|
67 |
for February |
|
|
595¼ |
for Build |
|
|
|
|
| March 2004 |
|
|
3 |
1½ |
Under dash infill panel number two. |
|
5 |
2 |
Infill panel 3 and carpet in pond liner. |
|
6 |
4 |
Infill panel 3 |
|
7 |
5 |
Finished carpet in pond liner, fitted dashboard
lower trim, fitted infill panel 2, exhaust wrap and changed washers at the
leaky brake banjo. |
|
8 |
2 |
Tighten brakes and polish exhausts. |
|
9 |
6 |
Bleed
brakes, adjust rear ride height and shocks.
MOT and test
drives including brake balance. |
|
10 |
1 |
Handbrake and infill panel number three. |
|
14 |
2 |
Final infill panel and a good wash. |
|
15 |
3 |
Grease, fuel, small adjustments and pack tools
into support vehicle. |
|
16 |
3 |
SVA (excluding drive time). |
|
23 |
1½ |
Number plates, tax disc, rear view mirror
changed. |
|
25 |
1¼ |
Front mud flaps. |
|
26 |
2 |
Mud flaps and sump gasket. |
|
27 |
2½ |
Hood frame brackets, fuel sender adjustments
and brake leak. |
|
28 |
1 |
Sticking throttle. |
| TOTAL |
|
37¾ |
for March |
|
|
633 |
for Build |